The Ulka Chemicals

Do any Pollution Control registration is required for Battery making Unit

Active 2 Replies 481 Views 2021-03-09 18:11:29 Battery
As the Battery making unit require various steps like, Lead Refining, Oxide making, Battery plate making, Charging, Battery Assembling. Can anyone guide on the government regulations on these steps?

Sharing is caring, show love and share the thread with your friends.


Arvind replied
3 Years
Sir, is the Environment Impact Assessment is required for Battery Plate making Unit?
Dr.Sarma replied
3 Years
You need air, water and hazardous waste pollution approvals to start a plant.  Within manufacturing location required suitable equipment needs to be commissioned to achieve required levels as per pollution control board.

Please Login to reply this topic. If you do not have account, please Register.

loading...